DOI to all article
Articles can be submission online
We Follow Peer Review Process
Call for Papers for Current Issue
Welcome to IJMCR
 

Article Published In Vol.2 (Jan-Feb-2014)

The Technical-Economic Reasoning of using the Cogeneration Project, Current Situation of the Network and Possibility of Changing the Method of Metering Thermal Energy

Pages : 83-85

Author : Fisnik H. Osmani

Download PDF

The City of Pristina has approximately 400,000 inhabitants and its own system of central heating, where production and distribution of thermal energy is carried out by a specialized company for district heating – PE “Termokos” j.s.c. It currently has a designed production of a total capacity of 116MW. Having in consideration the unaffordable increase of heavy oil price , rapid expansion of the city and old age of the current system, the district heating has completed the design and now has entered the project implementation cogeneration.

Key words: City of Pristina; District Heating “Termokos”; the Cogeneration Project; thermal energy; calculation.

 

 

 

 

Announcements

About IJMCR

All the persons belonging directly or indirectly to Microbiology, Biotechnology, Biochemistry, Virology, Environmental Sciences, Medical and Pharmaceutical Sciences, Food and Nutrition, Botany, Zoology, Mycology, Phycology and Agricultural Sciences.