The Technical-Economic Reasoning of using the Cogeneration Project, Current Situation of the Network and Possibility of Changing the Method of Metering Thermal Energy
Pages : 83-85Download PDF
The City of Pristina has approximately 400,000 inhabitants and its own system of central heating, where production and distribution of thermal energy is carried out by a specialized company for district heating – PE “Termokos” j.s.c. It currently has a designed production of a total capacity of 116MW. Having in consideration the unaffordable increase of heavy oil price , rapid expansion of the city and old age of the current system, the district heating has completed the design and now has entered the project implementation cogeneration.
Key words: City of Pristina; District Heating “Termokos”; the Cogeneration Project; thermal energy; calculation.